Also in
2012, FS Construction Joint stock Company received the order to exploit the
capacity of three PVD installing machines, from American (model Yutani MD450),
Japan (model SK400) and Korea (model Samsung SE-350).

FS JSC., has
been selected as the main contractor for the construction works of weak soil
treatment by the technology of prefabricated vertical drain in the ground of lot
CN6, at Dinh Vu Industrial Zone, Hai Phong.
Land area of
20 ha, located in CN.6 Dinh Vu Industrial zone, Hai An district, Hai Phong city.
FS Construction JSC., had to mobilize two (02) PVD installation machines with a
capacity of up to 20,000 meters long PVDs per day. Total volume of construction
is up to 2 million meters of PVDs with the value of nearly 7 billions Viet Nam
dong. This package has completed and accepted on schedule and technical requirements
required by the investor in the second half of 2012.